Industrial Scaffolding In Dartford

In May 2024, we erected a 3-story scaffold structure for a solar panel company to install renewable energy onto this flat roof.

The Process

Due to the large surface area, our team installed side rails with secure anchor points to ensure the installers would be safe around the edges of the roof.

For safe entry and exit of the scaffolding, we also installed a 3-storey scaffolding structure at the front of the building with a pully system installed by us so the installers to easily bring materials up and down the structure.

Safety

A Yellow gate has been installed at the front of the structure to highlight the entry point of the structure, and it is also a safety feature for when the installers are up on the roof, locking them securely in.

Contact us online

Simply fill out the form below and a member of our professional team will get back to you as soon as possible. Please ensure you provide as much detail as possible to ensure a more accurate initial quote.

    Our Address
    Aylesford Scaffolding
    Unit 14, Rochester Trade Park,
    Maidstone Road,
    Rochester, Kent,
    ME1 3QY
    Call us
    Opening hours
    Monday 08:30 - 16:30
    Tuesday 08:30 - 16:30
    Wednesday 08:30 - 16:30
    Thursday 08:30 - 16:30
    Friday 08:30 - 16:30